Skip to content
Pleated curtains installed on a window with filtered natural light.
  • Detail of fine pleating with translucent sheer fabric.
  • Pleated shade on a specially shaped window with a flawless finish.
  • Pleated curtains in a bedroom with warm light.
  • Pleated shades half-open showing minimal stack height.
Product

Pleated Curtains

Pleated system that adapts to any window with minimal stack height and maximum style.

Our Pleated Curtains take the classic pleated blind to another level. At Noily's Window Treatment, we create pleated systems capable of adapting to any type of window, even the most complex in shape or size. They stack to a minimal height when raised and can be configured with fully opaque or translucent light-filtering fabrics. You can even combine two different fabrics in a single curtain with the Day and Night finish for precise light control.

Materials
Pleated weave in sheer or blackout; combined Day and Night option.
Operation
Chain or cord.
Warranty
1 year on labor and materials.
Lead time
2-3 weeks.
Made to measure
Free consultation
Professional installation
Versatility

Use cases

Customization

Materials and colors

Reference tones; available fabrics per swatch book.

Ice White

Cream

Silver Gray

Slate Gray

Soft Black

Noily's collection

Related products

View full catalog

Let's talk about your project

We offer a free consultation at your home, office, or development. Let's schedule a visit.

Frequently asked questions

Are the products made to measure?
Yes. Every curtain or blind is crafted to the exact dimensions of your space, ensuring a perfect fit and a flawless finish.
What materials are used in the products?
We use technical polyester-and-PVC fabrics for solar screens, blackout fabrics for roller blinds, and natural wood for venetian blinds, among other high-durability materials selected for each application.
Are the products washable?
Yes. The vast majority of our products are washable. We provide the correct care instructions for each material at the time of delivery.
How long does installation take?
A typical installation takes between 1 and 4 hours depending on the number of windows and the complexity of the project. We confirm the estimated time when the quote is approved.